Restricted Access Screw Pile Installation in Ealing
- 1
Following an onsite survey we proposed to utilise a helical pile foundation with reinforced concrete capping beam and to balance the proposed surrounding landscaped ground levels slightly.
- 2
The result was a foundation system which required minimal excavation and could be install quickly and efficiently (within 4 weeks).
- 3
In conjunction with the adjusted landscape levels it meant no material had to be transported from site.
- 4
Only the screw piles went down into the root areas resulting in minimal impact and allowing construction over root protection zones.
- 5
The ground beams were manufactured offsite which meant they could be installed quickly and efficiently with no cutting on site resulting in less noise and disruption to the local residents.
- 6
We also installed the cess tank and sustainable urban drainage systems.